In the fall of 1926, the Elks did a major renovation to the main floor of the building. Instead of six rooms, it was converted into one large room for use a lodge and also lounge for other occasions. On the lower floor what was referred to as hot air heating system was installed. While all of this may not sound dramatic, it was. This remodel project cost nearly $26,000–twice the amount of the purchase price. For even a better comprehension of this expenditure, the American Legion Memorial Building was under construction that year with a price tag of $23,000.