The Eagle Lake Cut

The first of many of deepening the intake to the Bly Tunnel.
The first of many of deepening the intake channel  to the Bly Tunnel.

One of the problems associated with Leon Bly’s tunnel at Eagle Lake concerned the construction. The original plans stated that the tunnel would tap the lake eight to nine feet below the surface. It was not until 1924, that it was revealed that the contractor, Grant Smith & Company had only had a cut three feet below the surface, and in that same year, one of the driest on record, that the water flow through the tunnel was inadequate.

In the fall of 1924, Edward Whaley was hired by the irrigation districts to make a cut five feet below the surface to correct the problem. Whaley, like Grant Smith, would not fulfill his contract either. The problem was blasting through solid rock. Each year the districts took it upon themselves to extend the channel further out into the lake. In 1932 the last work was done, but between the drought and water taken out, the lake had dropped by twenty-four feet.

Support by subscribing.

One thought on “The Eagle Lake Cut”

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.